OR/13/001 Model workflow: Difference between revisions

From MediaWiki
Jump to navigation Jump to search
Dbk (talk | contribs)
m 1 revision imported
Ajhil (talk | contribs)
No edit summary
Line 2: Line 2:




[[Category:OR/13/001 Model metadata summary report for the Colchester LithoFrame 10-50 model | 07]]
[[Category:OR/13/001 Model metadata summary report for the Colchester LithoFrame 10-50 model | 08]]

Revision as of 10:28, 4 August 2021

A standard GSI3D workflow (Kessler & Mathers, 2004; Kessler et al. 2009) for superficial geological models was followed, in the parts of the model surveyed as an integrated exercise ( all TM) borehole coding was followed by the field survey, the 1: 10 000 geological lines were captured digitally by CartoGIS from field slips and/or fair drawn linework on plastic. The resulting 1:10 000 scale provisional shape files were then provided for use in modelling. Edits to the shape files were made iteratively as a result of the modelling, in particular subcrops at rockhead were revised with the benefit of a 3D visualisation of the geology.. It has been assembled and edited using the current versions of the GSI3D software since 2006 i.e. 2.0 - 2.6 - 2011 - 2012 (bedrock).